Introduction
- The Project starts from the end point of Package-17 of Northern Loop of Ring Road having Sui Gas Town on its right side and Bankers Town on its left and is almost 22.4 km long, divided into two (2) sections namely SL-1 (9.35 km) and SL-2 (13.0 km). Brief description of the alignment is given below:
- SL-1: Starts from Sui Gas Town and ends at Ferozepur Road. The alignment passes through Kamahan village, crosses the Hadiara drain and ends at interchange to be constructed at GajjuMattah on Ferozepur Road.
- SL-2: Starts from Gajju Mattah Interchange and ends at Raiwind Road. This part of alignment passes near Islampura, Halloki, through Fazaia Housing Society and ends at interchange to be constructed on Raiwind Road.
Location |
Lahore |
Proposal Type |
Solicited with BOT |
Estimated Cost |
PKR 24,260 million |
Concession Period |
25 Years |
Concerned/Sponsoring Agency |
Lahore Ring Road Authority (LRRA)/C&W Department |
Current Status |
Commercial Operational Date on 22.12.2017 |
Salient Features
- 22.4 Km (SL-I & SL-II)
- Interchanges= 06 Nos
- Bridges other than interchanges=06 Nos
- Vehicular/Pedestrian Underpasses=18 Nos
- Drainage Culverts (0.9 m ø) =21 Nos
- Utility Box Culverts (2M*2M)= Every 5.0 Km
- Utility Pipes (2*225mm ø)= Every 2.5 Km
- Intelligent Transport System
Role of Government Agency
- Encumbrance free ROW
- Land Acquisition
- Relocation of Utilities
Role of Private Party
The Concessionaire shall be responsible for the overall implementation of the Project, including but not limited to the investigation, study, engineering, procurement, construction, financing and operation & maintenance of the Project in line with the terms and conditions provided in Concession Agreement.